DC/26/2959/CON
Land To North Of Railway Line Henley Road Ipswich Suffolk
Consultation - Submission of Reserved Matters (appearance, layout, landscaping, and scale) for Phase 4a (Part of Phase 5 and 6 of the approved Phasing Strategy), and revised details for part of Country Park Phase 6 and Phase 7 (to accommodate changes to the paths), of the development at Henley Gate comprising roads, shared cycle and pedestrian path, open space, landscaping, drainage, pumping station and other associated infrastructure works pursuant to Outline Planning Permission IP/16/00608/OUT comprising up to 1,100 dwellings, local centre, country park, open space, sustainable urban drainage systems, landscaping, infrastructure and engineering works, and 2 no. access points from Henley Road and provision of access points for pedestrian/cycle bridge and vehicular bridge over railway. The Application also seeks to part discharge Condition 26 (Arboricultural Method Statement) of IP/16/00608/OUT in relation to Phase 4a. IP/16/00608/OUT was an EIA development and an Environmental Statement was submitted with the application under the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 2011 (as amended) (Revised Description).
—
20 Aug 2026
Nearby applications
Within 0.3 miles — as far back as our records go for this area.