26/03106/S19LB
Darwin College Silver Street Cambridge Cambridgeshire CB3 9EU
S19 to vary condition 2 (Approved plans) of listed building consent 24/03581/LBC (Alterations to the fabric of the Hermitage, Newnham Grange, Stevenson Building, Rayne Building and Dining Hall to upgrade thermal performance and facilitate connection to a low carbon heat network.) 1. Removal of the lead clad roof-level water tank: Following detailed technical design, the external roof-mounted water tank is no longer required. Its removal would allow for a simplified and improved roof drainage layout. 2. Addition of an external vent cowl: The inclusion of one single vent on the west elevation to correctly align the drawings with the mechanical services strategy and 3. Alteration to riser overrun height: An increase of approximately 285mm to the height of the riser overruns to facilitate the necessary routing of air handling ductwork from the riser onto the roof plant area.
—
14 Aug 2026
CB3 9EU
Nearby applications
Within 0.3 miles — as far back as our records go for this area.