← Back
Epping Forest District Council

EPF/1213/26

Waltham Cross to Tottenham Substation, near to Highbridge Street, Waltham Abbey

Approved

Application to discharge Requirement 13 (Stage 5b) - Construction Environment Management Plan by National Grid Electricity Transmission plc for an Order Granting Development Consent for the North London Reinforcement Project for the uprating of an existing 275kV transmission line of approximately 14km in length from Waltham Cross substation to Tottenham substation to enable it to run at a voltage of 400kV, together with associated development.

Type
—
Submitted
18 Jun 2026
View on council portal →

Nearby applications

Within 0.3 miles — as far back as our records go for this area.

Goldings Croft, Clays Lane, Loughton, IG10 2RZ
Loft conversion with catslide dormer roof design and associated infill extensions.
Pending
EPF/1781/26 · 0.1 mi away · 1 week ago
2, Clays Lane, Loughton, IG10 2RZ
Approval of Detail Reserved by Condition 6 Trees and Landscaping (Extension to rear...
Approved
EPF/1706/26 · 0.1 mi away · 7 Sep 2026
5, Firs Drive, Loughton, IG10 2SL
Alteration of existing roof to a raised, primary gable end roof. Proposed chalet...
Pending
EPF/1510/26 · 0.3 mi away · 4 Sep 2026
The Lodge, Goldings Hill, Loughton, IG10 2RY
Non-Material Amendment to EPF/323/25 (Extensions to existing lodge and erection of two...
Approved
EPF/1640/26 · 0.2 mi away · 26 Aug 2026
Land fronting Ongar Road adjacent access road to Bundish Hall Farm.
Prior Notification Agricultural for commercial polytunnel and ancillary water storage tank.
Approved
EPF/1473/26 · 0.0 mi away · 30 Jul 2026
21, Goldings Rise, Loughton, IG10 2QP
Certificate of Lawful Development for proposed conversion of garage to habitable space.
Approved
EPF/1450/26 · 0.2 mi away · 27 Jul 2026
11, Broadstrood, Loughton, IG10 2SB
Proposed single storey side & rear extension to accommodate a swimming pool building &...
Approved
EPF/1371/26 · 0.1 mi away · 15 Jul 2026