← Back
Westmorland and Furness Council

2026/1864/LBC

Wreaks End Causeway Bridge, On the A595, West Broughton, LA20

Pending

Listed Building Consent for the repair of a damaged 2m section of the downstream parapet wall east of centre. Remove damaged material and reconstruct using available original material. A new coping stone approximately 900mm in length to replace on damaged beyond repair. Removal of sawn cut copings to be replaced by new riven slate copings. Replace sawn cut slate copings on 2.8m downstream parapet extension constructed in September 2025 with the Broughton Moor riven slate

Type
—
Submitted
23 Sep 2026
View on council portal →