26/01127/NSIP
Feckenham Sub Station The Saltway Feckenham Worcestershire B96 6JR
(CONSULTATION COMMENTS SHOULD BE MADE DIRECTLY TO ARROW VALLEY SOLAR ON THEIR WEBSITE https://arrowvalleysolar.co.uk/) Pre-application stage (prior to Development Consent Order) consultation relating to Arrow Valley Solar, a proposed solar and energy storage scheme. Further information and consultation materials along with details on how to submit representations are available at: https://arrowvalleysolar.co.uk/ The consultation relates to the construction and operation of an electricity generating station with associated battery energy storage, substations, ancillary infrastructure and grid connection infrastructure connecting into the National Electricity Transmission System (NETS) with the point of connection at the Feckenham 400kV substation
—
28 Sep 2026
B96 6JR