PL/2026/01818/HS2DIS
Land Intersecting The B4102 Meriden Road And The River Blythe, To The North Of Patrick Farm
Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising: Structures - Provision of a ditch crossing slab beneath the southern end of River Blythe viaduct (consented separately - SMBC planning ref: PL/2023/02477/HS2DIS); Earthworks - Engineering earthworks to form the toe of two adjoining embankments; landscape earthworks; engineering earthworks to form a maintenance access strip (MAS) and associated ford crossing at northern end of the River Blythe Viaduct (consented separately - SMBC planning reference: PL/2023/02477/HS2DIS) and a maintenance access track (MAT), including part of a layby to the MAT around the River Blythe Viaduct southern embankment to connect to part of the layby approved under Patrick Cutting and Embankment (consented separately - SMBC reference: PL/2025/00285/HS2DIS); and engineering earthworks to form drainage ditches, including a drainage ditch incorporating a concrete drop-inlet cascade around the embankment at the southern end of River Blythe viaduct (consented separately - SMBC planning reference: PL/2023/02477/HS2DIS). Fences and Walls - Provision of Vehicle Restraint Systems (VRS); and provision of boundary and security fencing, including access gates.
—
5 Oct 2026
Nearby applications
Within 0.3 miles — as far back as our records go for this area.