← Back
Epping Forest District Council

EPF/1762/26

Waltham Cross to Tottenham Substation, near to Highbridge Street, Waltham Abbey

Approved

Application to discharge Requirement 11 (Stage 5a) - Contaminated Land Strategy by National Grid Electricity Transmission plc for an Order Granting Development Consent for the North London Reinforcement Project for the uprating of an existing 275kV transmission line of approximately 14km in length from Waltham Cross substation to Tottenham substation to enable it to run at a voltage of 400kV, together with associated development.

Type
—
Submitted
15 Sep 2026
View on council portal →

Nearby applications

Within 0.3 miles — as far back as our records go for this area.

Land Adjacent to Harlow Road, Near Roydon, Harlow
Variation of Condition 29 Biodiversity Net Gain of EPF/1947/22 Allowed on Appeal (The...
Pending
EPF/2043/26 · 0.1 mi away · 3 weeks ago
Land East of Hainault Road, Chigwell
Outline Application (all matters reserved except means of access) for housing led...
Pending
EPF/0729/26 · 0.1 mi away · 19 Oct 2026
Land at Jack's Hatch, South of Parsloe Road, Harlow
Outline planning application with all matters reserved except means of access from...
Pending
EPF/1753/26 · 0.0 mi away · 8 Oct 2026
Waltham Cross to Tottenham Substation, near to Highbridge Street, Waltham Abbey
Application to discharge requirement 3 – Written scheme setting out all stages of the...
Approved
EPF/1887/26 · 0.0 mi away · 8 Oct 2026
Waltham Cross to Tottenham Substation, near to Highbridge Street, Waltham Abbey
Application to discharge Requirement 4 (Stage 1b) - (Approved Details) by National...
Approved
EPF/1784/26 · 0.0 mi away · 18 Sep 2026
Shell Service Station, High Road, Epping, CM16 5HW
Demolition of the Existing Sales Building, Shed and Shipping Container and Erection of...
Approved
EPF/1790/26 · 0.3 mi away · 18 Sep 2026
177 High Road Chigwell IG7 6NX
Approval of Details Reserved by Condition 18 Contaminated Land of EPF/2868/20 Allowed...
Approved
EPF/1684/26 · 0.0 mi away · 3 Sep 2026
Land Adjacent to Harlow Road, Near Roydon, Harlow
Approval of Details Reserved by Condition 9 Construction Traffic Management Plan of...
Approved
EPF/1686/26 · 0.3 mi away · 3 Sep 2026
Land adjacent to 2 Uplands, Loughton IG10 1NG
Approval of Details Reserved by Conditions 3 Surface Water Drainage, 4 Hard and Soft...
Approved
EPF/1560/26 · 0.1 mi away · 12 Aug 2026
Land adj. Chaulkfield Nursery Sedge Green Road Nazeing EN9 5JS
Retrospective consent for change of use of former packing shed to car sales.
Approved
EPF/0870/26 · 0.3 mi away · 30 Apr 2026