26/01909/FUL
Replacement of two existing scaffold staircases with new steel stair structures incorporating intermediate landings and integrated lighting- relocation of existing passenger lift to the rear of the site- rationalisation and improvement of the entrance forecourt including resurfacing, removal of level changes, and replacement of existing double-leaf entrance gate with a single-leaf timber-clad door- extension of existing first-floor decking in two locations to provide additional unexposed external seating, introduction of one lightwell through existing first-floor deck- removal of fixed furniture from existing entrance hall to enable flexible community use- extension of timber cladding to southern site boundary with new access door with associated cosmetic repairs, re-finishing and upgrading of existing guarding and railing systems
FUL
23 Oct 2026