26/07315/FULL
30 Inverness Terrace London W2 3JA
Relocation of air conditioning units throughout to the lower ground floor lightwells within aluminium enclosure; replacement of all pipes with cast iron pipes; alteration to balconies including replacement of UPVC door with original door arrangement and replacement railing; reopening of previously infilled windows; replacement marble tiles at hallway of No.32 with Victorian floor tiles; replacement of all doors facing the communal staircase with the correct period style doors; removal of red clay tile leanto roof at first floor rear and the roof made good; removal of link bridges to the rear of the second floor and the rear of the third floor; and reopening of previously infilled windows to the stairs lobby at ground, first and second floor to No.30. (Linked with 26/07316/LBC)
—
26 Oct 2026