81428
White Cross Offshore Windfarm (Onshore Project)
Approval of details in respect of part discharge of condition 31(a) (Bat Mitigation Strategy - Pre-construction survey data in relation to 'The Scope' of the surveys only) attached to planning permission 77576 (Full planning permission for the construction and installation of onshore electrical infrastructure required to export electricity from the White Cross Offshore Wind Farm to the national distribution network; including installation of 132kV underground electricity transmission cable(s) from landfall at Saunton Sands Car park to a new substation at East Yelland. Construction of temporary facilities required during construction to include haul road, vehicular access, compounds, associated works areas and a permanent substation access road . Construction of a new substation under the Rochdale Envelope Approach with additional information regarding architectural form and silhouette, design code, scale and layout, landscaping, lighting, and appearance and materials)
Discharge of Conditions
12 Feb 2026
5 Nov 2026
Nearby applications
Within 0.3 miles — as far back as our records go for this area.