26/06597/LBC
The National Gallery Trafalgar Square London WC2N 5DN
Refurbishment and repair of Room 9 including replacement of the existing fabric wall covering; removal and replacement of the existing timber flooring; cleaning, repair and conservation of existing Verde di Prato marble skirtings and door surrounds; repair and redecoration of the decorative plaster ceiling and cornice, including revisions to the existing gilding scheme; refurbishment of the existing rooflight and associated roof repairs; temporary removal and reinstatement of external louvre assemblies; and associated mechanical and electrical upgrades including concealed cornice uplighting, replacement lighting equipment and replacement/additional power outlets.
—
25 Sep 2026
16 Nov 2026
WC2N 5DN
Nearby applications
Within 0.3 miles — as far back as our records go for this area.