LA08/2026/1255/DC
11 St Malachys Primary School Chapel Lane, Armagh, BT61 7EG
Discharge of Condition 16 ofLA08/2023/1665/F which reads: Prior to the commencement of development, a final Construction Environmental Management Plan (CEMP) shall be submitted to and agreed in writing with the Council in consultation with NIEA Water Management Unit, and shall be implemented in accordance with the timescale and details set out therein. The final CEMP shall include but not be limited to: • Identify the perceived risks to the aquatic environment e.g. from cement, concrete, grout, fuels/ oil/ hydrocarbons and suspended solids, • Identify potential pollution pathways, • Identify the mitigation measures employed to minimise the risk of pollution to any waterway (as defined by the Water (NI) Order 1999) e.g. • Safe refuelling, handling and storage practices for earth stockpiles and secondary containment for chemicals, oil, fuels etc. • Emergency spill procedures shall be addressed and should include the NIEA pollution hotline 0800 80 70 60 along with a timeframe for response. For example "any spillages / pollution incidents should be reported to the NIEA water pollution hotline within 30 minutes of the incident occurring unless it is not safe to do so"
—
16 Nov 2026
BT61 7EG
Nearby applications
Within 0.3 miles — as far back as our records go for this area.