DC/26/2504/DRC
Snape Maltings Snape Bridge Tunstall Suffolk IP17 1SR
Discharge of Condition Nos. 3 and 5 of DC/16/3159/FUL - Improvements to existing flood defences comprising: a mix of hard and soft engineering works which will raise, renew or replace existing flood defence structures and affecting buildings and structures within the curtilage of a listed building; replacement of ground floor windows to the east elevation of the concert hall - Ecological Mitigation and Improvement Plan and i) Specification for new walling brickwork; brick bond; mortar type; coping; and junction with existing bridge to be supplied. ii) Replacement steel moorings to existing quayside upstand where replaced to match existing in position, size and material iii) Details of the connection between the new flood wall and north gable of the concert hall iv) Details of new platform lift from external terrace to refectory/concert hall entrance on south elevation to show appearance, position, size. v) Detail of the gradient of the footpath/bank at the eastern end of the works proposed in Area 3.
—
13 Jul 2026
IP17 1SR
Nearby applications
Within 0.3 miles — as far back as our records go for this area.