2026/0505/LBA
Ryhall Hall Church Street Ryhall Rutland PE9 4HR
Installation of a stainless steel flexible flue liner in each of the side stack chimneys to the north. Installation of a chimney cowl over each of the 2 chimney flues. Replacement guttering to the north elevation. Reduction in height of a modern chimney on the north elevation. Remove the infill render (cement onto galvanised mesh) around the arched Georgian window on the north elevation. If the stonework beneath is sound, it is proposed to remove this render to allow the stonework to breathe. In the alternative if the stonework beneath is not sound, it is proposed to remove the cement render and replace it with a lime render which will allow the stonework to breathe. Replacement roof of single storey extension to the north elevation with rolled metal. Repair and repaint all windows. Replace timber finish gates with wrought iron gates.
—
28 Apr 2026
PE9 4HR
Nearby applications
Within 0.3 miles — as far back as our records go for this area.