Sunquest 6 - 8 Pontygwindy Road Caerphilly CF83 3AA
Change the use of former sun bed shop to retail (Use Class A1), including a new aluminium shop front including roller shutters
Caerffili - Caerphilly, Wales · Looking for a specific address instead? Search by postcode
Last 30 days
Change the use of former sun bed shop to retail (Use Class A1), including a new aluminium shop front including roller shutters
Construction of a single storey extension to the rear of the property, extending from the existing rear dining room. The extension is to create a double bedroom suitable for a wheelchair user.
Discharge of Condition 13 (Noise) of planning application 24/0068/FUL.
Install two roller-shutter doors and two pedestrian-access doors within the southern side elevation, removal of an existing fire exit door and associated external alterations
Erect 2 No. semi-detached two storey dwellings, off-street parking and associated works
Vary condition 01 (time to commence dev) of planning consent 21/1038/FULL to extend the time limit for a further 5 year period
Erect conservatory to the rear of the property
Proposed conversion of existing garage to create a 1 bed residential unit.
Convert garage into living accommodation with a new window in lieu of existing garage door
Obtain a Lawful Development Certificate for conversion of the existing integral garage into habitable accommodation, replacement of the garage door with a window, associated internal alterations and installation of a compact through-floor lift
Vary conditions 4 (Hours of operation) & 5 (Noise insulation) of planning consent 26/0011/COU (Change the use from Class B2 (light industrial) to Use Class D2 (indoor sport), to allow operation as an indoor sports facility for Padel)
Change the use from office space to two residential units
Proposed single storey rear extension.
Obtain a Lawful Development Certificate for installation of 140 No. roof-mounted photovoltaic solar panels on the east-, south- and west-facing pitched roof slopes of the existing commercial building, providing a total installed generating capacity of approximately 85.4 kWp, together with associated inverter, mounting system and ancillary electrical infrastructure