45A Wood End Bluntisham Huntingdon PE28 3LE
Erection of 1 dwelling
Cambridgeshire, Eastern · Looking for a specific address instead? Search by postcode
Last 30 days
Erection of 1 dwelling
Demolition of conservatory, single storey rear extension and window relocation
Construction of irrigation reservoirs by the extraction, processing and export of sand and gravel; widening vehicular access onto the A1123 (Hillrow Causeway) at Doles Drove; mineral processing plant, weighbridge and three 6 metre x 3 metre temporary office buildings. , Informative: Section 73 planning application to vary condition 4 (timescale of permission) to extend the duration of extraction, processing and despatch of mineral from 28 February 2027 to 28 February 2029.
Submission of details required by condition 4 (Contaminated Land Phase 1), 5 (Trees - Protection), 6 (Renewables), 8 (Surface Water), 9 ( ecologically sensitive artificial lighting scheme), 10 (Ecology Enhancement), 13 (Contaminated Land ), 17 (Highways), 22 (Plot 2 Self Build) and 23 (Contaminated Land ) of outline planning permission 26/00301/OUT
Cut back Beech and Horse Chesnut tree by 2 metres
Retention of urgent repairs to the left-hand (east) gable end chimney stack and relining of its flue, and internal alterations
Clear a fallen Ash tree
Creation of wetland habitat following excavation and processing of sand and gravel. , Informative: Section 73 planning application to vary planning conditions A18 & A19 (Routing Agreement) of planning permission CCC/25/082/VAR to allow an exemption for 10 HGV movements per day to use the A1123 between Needingworth and Stretham.