5, Reeves Way, Peterborough, PE1 5LF
Two storey side and rear extension, single storey rear extension and front canop
Cambridgeshire, Eastern · Looking for a specific address instead? Search by postcode
Last 30 days
Two storey side and rear extension, single storey rear extension and front canop
Single-story extension to semi detatched property Maximum length from original
Non-material amendment affecting conditions 3 (Approved plans) and 11 (Construction of concrete interior walls) of planning permission CCC/24/048/FUL (Metal Recycling Facility for the storage, sorting, separation, grading, sheering, baling, compacting, crushing, granulating and cutting of ferrous metals or alloys and non-ferrous metals) to allow shipping containers to be used in place of some of the concrete ‘lego’ blocks
Single storey rear extension Maximum length from original rear wall: 3.5m Maxi
Change of use of existing dwelling to offices (Class E(g)(i))
Details reserved by Condition 09 of planning permission F/YR26/0238/F (Erect 2 x dwellings including demolition of existing dwelling)
25/01449/FUL - Discharge of condition C9 (Management and Maintenance Scheme) of
Change of Use from B8 (Storage or distribution) to B8 (Storage or distribution)
Pollard NT2 Weeping Willow to reduce the height and spread by approximately 4-5 metres and remove the weight from the limbs to address recent limb failure and overextended growth over adjacent buildings and property
Change of use from residential to use class F1(f) and installation of new cabin
21/01150/FUL Discharge of condition C12 (Ground Remediation Report) and C14 (Fir
Single storey rear extension
Installation of plinth, statue and lighting
23/00725/FUL Variation of condition C2 (approved plans) of planning permission 2
Application to discharge condition 10 (Access road improvements) of planning permission CCC/24/078/FUL (Importation of controlled inert construction and demolition wastes for the buttressing and stabilisation of the southern face of a former mineral excavation face with associated screening, stockpile and storage areas)